BauGrid® Welded Reinforcement Grids
- Replaces Conventional Transverse Reinforcement in Concrete Structures
- Improves Ductility resulting in Superior Seismic Performance
- Saves Up to 75% in Rebar Cage Assembly Labor
- Reduces Rebar Cage Assembly Time Up to 50%
- Saves Up to 50% in Confinement Steel Weight
- Saves Up to 35% in Cage Installation Labor
- Eliminates Congestion
- Up to 1/8” (3mm) Dimensional Accuracy
- Saves Construction Time
- Reduces Concrete and Reinforcing Steel
- Minimum Wire Tying
|
BauGrid® Facts
- ICC-ES Legacy Report No.: ER-5192 (Currently undergoing re-examination for conversion to new ICC-ES as required by ICC Rules of Procedure)
- Patented in USA, Canada, EU and Japan
- Winner of NOVA Award by Construction Innovation Forum (CIF)
- Used in the World’s Tallest Pre-cast Concrete Building (40-story) in region of highest Seismicity (Zone 4) - San Francisco, California
- Used in the World’s Tallest Tunnel-Formed Structures (Two 22-story) in region of highest Seismicity (Zone 4) – Long Beach, California
- Being used in San Francisco’s 4th tallest building at 60-story (currently under construction)
- Approved for Use in Los Angeles, San Francisco, San Diego, Long Beach, Oakland, Daly City (CA), Phoenix (AZ), Eugene (OR), Long Island (NY) and Hawaii
|